Production Optimization
Complex Assembly

The Project

CUSTOMER
Family owned company with >€ 200 m annual turnover

CHALLENGES
OEE < 55% @ planned 80% PROJECT DURATION
3 month

RESULTS
Identify and realize measures to reach an OEE of 80-85%
(equals 20-25% cycle time reduction without additional investments)

METHODS
Covalex-Process Flow Analysis
Waste Analysis
Covalex-Cycle Time Study
Covalex Approaches to optimize automated and manual Processes